VOKERA 0557 FLOW SWITCH DIAPHRAGM (AUTO BY-PASS) - MYNUTE 28/96SE
Product Information
Part also fits:
- 18/72 DMCF COMBI
- 20/80 CF FLOWMATIC
- 20/80 RS FLOWMATIC
- 20/80 RS TURBO (A)
- 20/80 RSS FLOWMATIC
- 21/84 DMCF COMBI
- 24/96 CF FLOWMATIC
- 24/96 RSE FLOWMATIC
- ELIDRA 24/96 A.G.M
- MYNUTE 10 SE
- MYNUTE 12/48 RS
- MYNUTE 14 SE
- MYNUTE 14/48 SE
- MYNUTE 14/48 SP
- MYNUTE 20 SE
- MYNUTE 20/70 SE
- MYNUTE 28/96SE
- MYNUTE 28SE
Buy your Vokera 0557 - Mynute 28/96se Flow Switch Diaphragm (auto By-pass) today, with a fast UK delivery..
The Vokera combination boilers and water heaters make use of a rubber diaphragm to activate the domestic hot water by diverting the primary water circuit to the plate heat exchanger. This provides hot water to the taps or perhaps shower. One side in the diaphragm is subject to indirect heat via the hot water in the primary circuit flowing through the hydraulic assembly. This design is common in combination boilers and other water central heating appliances. In case a diaphragm has failed the boiler and won't switch easily between providing water to the hot taps and providing central heating. In this instance it'll need changing. Many heating engineers will recommend exchanging the whole hydraulic section assembly. This isn't necessary as the boiler manufacturer mostly provide you with the specific part and the unit will function properly after the diaphragm is replaced., Vokera Diaphragms Can Be Delivered Next Day
Delivery
VOKERA Boiler Spares orders - delivered within 24 hours for all in-stock VOKERA spare parts, when purchased before 3pm. We also supply many other spare parts and accessories for VOKERA boilers.
Disclaimers:
-
Warranty
VOKERA spare parts come with manufacturers standard twelve months warranty.
-
Warning
When replacing any spare part on appliances, use only genuine boiler spare parts that you can be assured conform to the safety and performance specification that the boiler manufacturer recommends. For your safety & your families, please do not use reconditioned or copy parts that have not been clearly authorised by the boiler manufacturer.