SIME 5192200 GASKET FOR SEALED CHAMBER - MURELLE ELITE HE 25
Product Information
Part also fits:
- ECOMFORT 25HE
- ECOMFORT 30HE
- ECOMFORT 35HE
- ECOMFORT PLUS 25HE
- ECOMFORT PLUS 25HE SYSTEM
- ECOMFORT PLUS 30HE
- ECOMFORT SYSTEM 25HE
- ECONOMY HE25 BF
- ECONOMY HE30 BF
- ECONOMY HE35 BF
- FORMAT 100B LPG
- FORMAT 100B NG
- FORMAT 100C
- FORMAT 100C LPG
- FORMAT 110C
- FORMAT 30HE
- FORMAT 80B LPG
- FORMAT 80B NG
- FORMAT 80C
- FORMAT 80C LPG
- FORMAT SYSTEM 24 EI LPG
- FORMAT SYSTEM 24 EI NG
- FORMAT SYSTEM 24 LPG
- FORMAT SYSTEM 24 NG
- FORMAT SYSTEM 25HE
- FORMAT SYSTEM 30 EI NG
- FORMAT SYSTEM 30 NG
- MURELLE ELITE HE 25
- MURELLE ELITE HE 30
- MURELLE ELITE HE 35
- MURELLE ELITE HE 35T
- MURELLE HE25 BF
- MURELLE HE30 BF
- MURELLE HE35 BF
- MURELLE SYSTEM HE12
- MURELLE SYSTEM HE20
- MURELLE SYSTEM HE25
- MURELLE SYSTEM HE30
- MURELLE SYSTEM HE35
Buy your Sime 5192200 - Murelle Elite He 25 Gasket For Sealed Chamber today, with a fast UK delivery..
The Sime Murelle Elite He 25 Gaskets, O'rings, Seals And Washers Are There To Give A Seal To Prevent A Loss Of Air, Gas And Water In Most Central Heating System. Many Of The O'rings, Gaskets, Seals And Washers Are Specific To A Certain Specific Location Within The Boiler And Are Extremely Seldom Interchangeable Due To The Specific Size And Thickness. They Permit The System To Be Sealed To Lower The Probability Of Leakage., Sime Gaskets And Washers Are Available Next Day
Delivery
SIME Boiler Spares orders - delivered within 24 hours for all in-stock SIME spare parts, when purchased before 3pm. We also supply many other spare parts and accessories for SIME boilers.
Disclaimers:
-
Warranty
SIME spare parts come with manufacturers standard twelve months warranty.
-
Warning
When replacing any spare part on appliances, use only genuine boiler spare parts that you can be assured conform to the safety and performance specification that the boiler manufacturer recommends. For your safety & your families, please do not use reconditioned or copy parts that have not been clearly authorised by the boiler manufacturer.